Things have been pretty quite around here for awhile. There are a myriad of reasons why but one of the leading most is that since my studio started doing double-duty as my home office last March it hasn't functioned well for either purpose. Like a lot of people, I never imagined that 18 months later I would still be WFH and while their are pros and cons to that situation at this point I think it's permanent... or at least as permanent as anything can be these days. Another variable in this equation is that my youngest is a high school senior and I am literally counting down the days (236) until I'm an empty nester. I don't know exactly how things will shake out but I am adamant that this is my last New England winter. All of that is a long way to say my quilt studio/office has descended in to chaos so when I saw this year's Declutter to Destash Challenge hosted by Feel Good Fibers I was all in. Here's a picture of the before.
The Week 1 Challenge is to identify and prioritize all those WIPs so here goes...
- La Passacaglia - finish hand quilting.
- City Sampler - finish quilting.
- Joyful test block - baste, quilt and turn this in to a pillow.
- Joyful - finish piecing blocks, get fabric for sashing and finish flimsy. Backing and batting have been purchased.
- Drinks QAL - some blocks are made. Not sure how many more I'll do.
- Double Wedding Ring - basted and ready to be quilted.
- Houndstooth - finish quilting.
- Double Hour Glass - flimsy is finished. Needs a backing, then basted and quilted.
- Tula Nova - partially pieced.
- Fussy Cut Sampler - partially pieced.
- Limerick - flimsy, backing and batting are ready to be quilted but I might send this one out to be quilted. Need to make binding.
- Galaxy of Stars - flimsy backing and batting are ready to be quilted. Another one to send out for quilting. Need to make binding.
- Turquoise stars - needs to be rebasted. Hand quilt?
- Eiffel Tower - ready to quilt.
7. This Houndstooth quilt has be languishing in the TBQ pile for a long time. I started quilting it but got frustrated with the bubbling. My FMQ skills have come along way since then but I have yet to be inspired to pick this one up.
8. We're really descending in to the land of the UFOs now. This Double Hourglass flimsy has been sitting on my wall for a long time. I can't decide on a backing for it but if I get it basted it should quilt up fairly quickly.
9. I miss having a portable handwork project so this is probably a good time to pick up my Tula Nova. I barely got going on it so there's still plenty left to be done and lots of new Tula fabrics to add to the mix.
10. I managed to stick with this for the first 16 blocks then fell off the bandwagon. The pattern has 48 blocks. I really like the blocks that I've made so far so trying to decide if I should continue making more or just use the ones I have in an alternate layout and go with that.
11. I missed St. Patrick's day with this Limerick flimsy. Generally I do my own quilting, even if that just means attending the computerized longarm, but I don't have any real affinity for this one and in the interest of just getting it done I think I'm going to send it out to be quilted. Everything is prepped and ready to go so I it's just a matter of setting it up.13 and 14. These are also way old but the turquoise is hand pieced and they are both basted and just waiting to be quilted so I feel like at some point they should get finished. I'm not ready to count them out yet.
Wow you have a lot going on. I am not sure I can face to list all my projects. I am just doing a couple of projects at a time and in stages. It is a process though to keep at it but it does feel good to finish something. Keep going!
ReplyDeleteThis is such a great catalog of all of your WIPs! So glad that you are joining us for the Declutter to Destash Challenge! - Kim @FeelGood Fibers
ReplyDelete